Getting Services to the Site

Water, sewer, electric, gas and telecommunications, and whether the capacity you need exists at the boundary.

The survey, the geotechnical report and what you intend to build. That is enough to tell you what the site work involves.

Retention

In Florida it takes real acreage, before the building

Self-perform

Dewatering and deep foundations in house

Yield

The site work decides how much you can build

Licensed

General contractor, licensed in the state of Florida

Capacity is assumed to exist

A developer assumes water, sewer and power are available because there are services in the road. Available and adequate are different things, and an extension or an upgrade to reach the required capacity can cost more than the on-site utility work and take considerably longer.

What to confirm early

  • Actual available capacity at the point of connection.
  • Whether an extension or upgrade is required, and who pays.
  • Impact and connection fees, which can be substantial.
  • Utility company lead times, which are frequently long.
  • Easements needed for any off-site work.

How we handle it

  1. 01Confirm capacity with each utility before design is fixed.
  2. 02Install on-site distribution to the approved design.
  3. 03Coordinate connections and utility company scheduling.
  4. 04Secure any easements needed for off-site extensions.
  5. 05Test, certify and hand over each system.

Write to each utility during due diligence and ask for available capacity in writing. It is free, it takes weeks rather than months, and an inadequate sewer connection discovered after closing is a very expensive surprise.

Said plainly

Where we stop

Utility company lead times are outside our control and they are frequently long. We will program them as real activities and flag where a connection date is the binding constraint on occupancy.

FAQ

Common questions

Are services in the road enough?
Available and adequate are different. Confirm actual capacity in writing during due diligence.
Who pays for an extension?
Usually the developer. Establish it before closing.
Are connection fees significant?
They can be substantial and they are frequently left out of early budgets.
Can utility lead times be accelerated?
Rarely. They are programmed as real activities and flagged when they gate occupancy.