The Acreage Nobody Budgets For

Florida requires stormwater to be managed on site, and doing so consumes a genuine share of the land.

The survey, the geotechnical report and what you intend to build. That is enough to tell you what the site work involves.

Retention

In Florida it takes real acreage, before the building

Self-perform

Dewatering and deep foundations in house

Yield

The site work decides how much you can build

Licensed

General contractor, licensed in the state of Florida

Retention is designed after the building, and it should not be

A scheme is laid out with the building, the parking and the access, and retention is fitted into what is left. Then the calculations show it does not fit, and the scheme is redrawn — losing yield that a retention-first layout would have kept. The order in which those two are designed changes the answer.

What determines the requirement

  • Impervious area, which is the building plus all the paving.
  • The water management district's requirements for the location.
  • Soil conditions, which govern how quickly water percolates.
  • The water table, which limits how deep a pond can go.
  • Whether treatment as well as attenuation is required.

How we handle it

  1. 01Establish the stormwater requirement before the layout is fixed.
  2. 02Build ponds, structures and conveyance to the approved design.
  3. 03Coordinate with the water management district's permitting.
  4. 04Control erosion and turbidity throughout construction.
  5. 05Certify and hand over the completed system.

Lay out the stormwater before the building. It is the constraint with the least flexibility, and a scheme designed around it keeps more yield than one that squeezes it in afterwards.

Said plainly

Where we stop

On a tight site, the retention requirement may mean the program in the pro forma does not fit. We will establish that during due diligence rather than after the land is bought.

FAQ

Common questions

How much land does retention take?
A real share, driven by impervious area and soil conditions. It should be laid out before the building.
Can retention go underground?
Sometimes, and it is far more expensive. The water table limits the options.
Who sets the requirement?
The water management district for the location, alongside local requirements.
What if it does not fit?
The scheme changes. Better established during due diligence than after purchase.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.