What we do · Mass Grading & Earthwork

Cut, Fill and the Cost of Moving Dirt

Shaping the site to the design grades, where the cost is decided by whether the earthwork balances.

The survey, the geotechnical report and what you intend to build. That is enough to tell you what the site work involves.

Retention

In Florida it takes real acreage, before the building

Self-perform

Dewatering and deep foundations in house

Yield

The site work decides how much you can build

Licensed

General contractor, licensed in the state of Florida

Import and export are both expensive

A site that balances — where cut equals fill — moves dirt around and pays for machines. A site that needs material imported, or worse needs unsuitable material removed and replacement brought in, pays for trucking on every load. On flat Florida sites raised to drainage grade, import is common and it is frequently underestimated.

What drives the number

  • Whether cut and fill balance across the site.
  • How much fill is needed to reach drainage grades.
  • Unsuitable material identified in the geotechnical report.
  • Haul distance to a source or a disposal site.
  • Compaction requirements and testing.

How we handle it

  1. 01Take off quantities from the actual grading plan.
  2. 02Read the geotechnical report for unsuitable material.
  3. 03Price import and export honestly rather than assuming balance.
  4. 04Compact and test to the specification.
  5. 05Protect the site from erosion during the work.

Ask whether the earthwork balances before the grading plan is finalized. A design adjustment of a few inches across a site can turn an import job into a balanced one, and it is a free saving if anybody asks in time.

Said plainly

Where we stop

We will not assume a site balances. On Florida sites raised to drainage grade, import is common and pricing on an assumed balance is how earthwork budgets are exceeded.

FAQ

Common questions

What makes earthwork expensive?
Import and export. A balanced site moves dirt; an unbalanced one pays for trucking every load.
Can the design reduce it?
Frequently, if asked before the grading plan is final. It is a free saving.
What is unsuitable material?
Soil the geotechnical report says cannot support the works. It has to be removed and replaced.
Do you assume balance?
No. On Florida sites raised to grade, import is common.