Where it goes wrong
Five Ways Site Work Exceeds Budget
The geotechnical report, the water table, unsuitable material, permitting and what the survey did not show.
The survey, the geotechnical report and what you intend to build. That is enough to tell you what the site work involves.
Retention
In Florida it takes real acreage, before the building
Self-perform
Dewatering and deep foundations in house
Yield
The site work decides how much you can build
Licensed
General contractor, licensed in the state of Florida
5 where it goes wrong
All five are reducible, and none is reducible after the land is bought.
The Geotechnical Report
A few thousand dollars of borings routinely prevents hundreds of thousands in change orders, and it is still the thing owners economize on.
Read more →
The Water Table
Florida's water table is close to the surface, and on coastal sites it moves with the tide.
Read more →
Unsuitable Material
Organic soils, uncontrolled fill and material that will not support the works. It has to come out, and something has to go back in.
Read more →
Permitting
Horizontal work touches more agencies than the building does, and the approvals frequently run in sequence.
Read more →
What the Survey Missed
A topographic survey shows the surface. What is underneath is the source of most site work surprises.
Read more →
Next step
Find out what is actually wrong with it.
An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.
