Where it goes wrong · What the Survey Missed

Everything Underground

A topographic survey shows the surface. What is underneath is the source of most site work surprises.

The survey, the geotechnical report and what you intend to build. That is enough to tell you what the site work involves.

Retention

In Florida it takes real acreage, before the building

Self-perform

Dewatering and deep foundations in house

Yield

The site work decides how much you can build

Licensed

General contractor, licensed in the state of Florida

Utility records are not reliable

Abandoned lines, unrecorded services, old septic systems and utilities that were relocated without anybody updating a drawing are found by an excavator. On a site with a long history, the records describe a version of the underground that has not existed for decades.

What reduces the risk

  • Subsurface utility investigation before design, not after.
  • An environmental assessment on any former commercial site.
  • Talking to whoever has been on the site longest.
  • A stated contingency for unknown conditions.
  • Careful excavation where records are doubtful.

How we handle it

  1. 01Recommend subsurface investigation where history warrants it.
  2. 02Excavate carefully where records are doubtful.
  3. 03Report anything unexpected immediately, not at month end.
  4. 04Price a stated contingency and explain its basis.

Talk to whoever has worked on or near the site longest. A maintenance manager or a neighboring owner frequently knows about a line, a tank or a filled area that appears on no drawing anywhere, and the conversation costs nothing.

Said plainly

Where we stop

No investigation eliminates underground risk entirely. We price a stated contingency and explain the basis rather than implying the unknown has been removed.

FAQ

Common questions

Are utility records reliable?
On sites with a long history, frequently not. They describe a version that has not existed for decades.
What reduces the risk?
Subsurface investigation, environmental assessment, and asking people who know the site.
Can underground risk be eliminated?
No. We price a stated contingency rather than implying otherwise.
When should investigation happen?
Before design, not after.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.