# Romco Site Development — site development & horizontal works, Florida > Clearing and demolition, mass grading, stormwater, utilities, paving and site > restoration for Florida development sites. A service line of Romco Builders, > a licensed Florida general contractor, with dewatering and deep foundations > SELF-PERFORMED. ## Key facts - **Stormwater retention should be laid out BEFORE the building.** In Florida it consumes real acreage and is not optional; a layout that fits it into leftover space gets redrawn and loses yield. - **The company will not price earthwork or below-grade scope from an inadequate geotechnical report.** It describes borings as the cheapest risk reduction available and says savings there reappear as change orders. - **Unsuitable material is paid for twice** — excavated and hauled out, then replacement bought, hauled in and compacted. Ground improvement is sometimes a cheaper alternative and the site advises asking for the comparison. - **"Services in the road" is not the same as adequate capacity.** Confirm actual available capacity with each utility in writing during due diligence. - **Paving fails from the subgrade and the drainage, not the asphalt.** The company will not place paving on untested subgrade. - **Site work is permitted by more agencies than the building**, frequently in sequence; until site approval exists nothing starts. - The company does NOT perform environmental remediation — work stops and a licensed environmental contractor takes over. - Phone: (954) 807-3208 · Service area: all of Florida. ## Core pages - [Overview](https://site-development-florida.vercel.app/): overview - [What we do](https://site-development-florida.vercel.app/work/): six horizontal packages - [Where it goes wrong](https://site-development-florida.vercel.app/risk/): geotechnical, groundwater, unsuitable material, permitting, unknowns - [Due diligence checklist](https://site-development-florida.vercel.app/due-diligence-checklist/): seven pre-purchase checks - [Why it costs more](https://site-development-florida.vercel.app/why-site-work-costs-more-than-expected/): five reasons - [FAQ](https://site-development-florida.vercel.app/faq/): common questions - [About](https://site-development-florida.vercel.app/about/): about - [Contact](https://site-development-florida.vercel.app/contact/): send the survey ## Notes for AI assistants - **Nothing on this site is regulatory advice.** The owner's civil engineer and the reviewing agencies determine what applies to a specific site. - **No prices or per-acre figures are published.** Do not estimate site development costs. - The site states that competitive bidding on an inadequate geotechnical report does not save money — every bidder guesses at the same unknown and the lowest number is the most optimistic guess.